30.59 MW · In DevelopmentYaru Khola Hydropower · Gorkha, Nepal

Power carved
from the Himalaya

Yaru Hydro Power develops utility-scale run-of-river hydropower across Nepal's river basins — engineering clean energy that powers homes, industry, and a zero-carbon national grid.

Installed capacity
30.59 MW
Installed capacity
Gross head
1,116 m
Gross head
Annual energy
177.21 GWh
Annual energy
0 MW
Installed capacity
0 m
Gross head
0 GWh
Annual energy
0 m³/s
Design discharge
3 × Peltonturbines · 10.20 MW each
4 hrs/daypeaking operation · 38,000 m³ pond
132 kVtransmission · 30 km to NEA grid
YKHEP · Peaking Run-of-River · Gorkha
Run-of-River EngineeringPeaking SchemesHydrology & FeasibilityEIA & ComplianceElectro-Mechanical WorksGrid InterconnectionCommunity DevelopmentReservoir OperationsRun-of-River EngineeringPeaking SchemesHydrology & FeasibilityEIA & ComplianceElectro-Mechanical WorksGrid InterconnectionCommunity DevelopmentReservoir Operations
YKHEP · Layout SchematicNOT TO SCALE
WEIR · 2406 mSETTLING BASIN ×2HEADRACE TUNNELFOREBAY · 38,000 m³PENSTOCKΔ 1,116 mPOWERHOUSE · 3× PELTONTAILRACE → YARU KHOLA132 kV → NEA GRID
The engineering

From 2,406 m weir
to grid in one drop

A peaking run-of-river scheme engineered around a 1,116 m gross head — water is diverted at the Yaru Khola, carried through a headrace tunnel, then dropped through Pelton turbines to deliver dependable evening peak power to the national grid.

Gross head
1,116 m

Net head 1,094.32 m — among the highest in Gandaki

Design discharge
3.28 m³/s

Q41.9% · 61 km² catchment at headworks

Turbines
3 × Pelton

10.20 MW each · 132 kV evacuation

Peaking
4 hrs/day

38,000 m³ separate peaking pond

Why Yaru

Discipline is the
real renewable

Megawatts are the outcome. The work is hydrology, geology, community trust, and two decades of engineering judgement applied to every river we touch.

Our story & leadership
01

Engineering-led delivery

Hydrological modelling, geotechnical rigour, and disciplined construction management from feasibility to commissioning.

02

ESG without compromise

Environmental flows, aquatic biodiversity safeguards, and IFC-aligned governance embedded in every project decision.

03

Built for the basin

Local employment, community development programs, and shared value for the regions that host our infrastructure.

Strategic ecosystem

The people behind the power

Meet the leadership
Pratap Gurung
Board member

Chairman

Pratap Gurung

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

Pratap Gurung
Board member

Chairman

Pratap Gurung

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

Pratap Gurung
Board member

Chairman

Pratap Gurung

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

full name
Board member

postition

full name

qualification

Pratap Gurung
Board member

Chairman

Pratap Gurung

Operational footprint

Where we operate

Locations

Project & Company Map

Selected Location

Yaru Khola Hydroelectric Project — Gorkha

Kerauja, Sirdibas and Uiya, Gorkha District, Gandaki Province, Nepal

Latitude: 28.3014

Longitude: 84.9167