DevelopmentRun-of-RiverGorkha, Gandaki, Nepal
Yaru Khola Hydropower Project
Yaru hydro power ltd hydropower project delivering dependable renewable energy.
Installed Capacity
18.5 MW
Annual Generation
96 GWh/yr
Gross Design Head
1116 Meters
CO₂ Offset
52,800 T/Yr
Project Name
Yaru hydro power ltd
Scheme Type
Peaking Run-of-River (PRoR)
Peaking Time
4 hours
River
Run of river
Latitude
123,32,23
Longitude
23,23,23
District
Gorkha
Province
Gandaki
Project Site
gorkha
Headworks
gorkha
Powerhouse
gorkha